Cost Plan vs Estimate vs Bill of Quantities
Understand what each document does, when it is prepared and how it supports budgeting, design and tendering.
Read guide →QS Insights
Guidance for Singapore contractors, developers, architects and property owners making construction cost, tender and commercial decisions.
Explore guidesLatest resources
Understand what each document does, when it is prepared and how it supports budgeting, design and tendering.
Read guide →Cost planning, package interfaces, tendering and commercial control for operational and specialist facilities.
Read guide →A structured approach to comparing cost, function, quality, programme and risk before project options are approved.
Read guide →How QS fees are structured, what affects a quotation and how to compare proposed scopes on a consistent basis.
Read guide →Review compliance, pricing, exclusions, allowances, clarifications and commercial risk before contractor selection.
Read guide →Record a consistent index series, calculate cumulative movement, chart the trend and export a transparent CSV record.
Use tracker →Build a preliminary budget from floor area, a selected project rate, allowances, fees, contingency and GST.
Use calculator →Track instructions, quotations, submitted, assessed and approved values, supporting records and final-account status.
Download template →Estimate how index movement or a compounded annual escalation assumption may affect a Singapore construction budget.
Use calculator →Assess completed work, materials, variations, retention and supporting records using a clear monthly reconciliation.
Read guide →How a BOQ is prepared and used for consistent tender pricing, comparison, progress valuation and cost control.
Read guide →Reconcile the contract sum, variations, provisional items, claims, certificates and outstanding commercial records.
Read guide →Budgeting, tender comparison and variation control for Singapore office, retail, clinic and other commercial renovation projects.
Read guide →Connect instructions and changed scope to measurable quantities, suitable rates and reliable supporting records.
Read guide →Test quantities, rates, scope gaps, market quotations and project risks before tender prices are committed.
Read guide →A 24-page schedule of common construction work items, technical descriptions, measurement units and indicative 2026 reference amounts.
Download reference →Compare up to four construction tenders across pricing, trade costs, clarifications, commercial risks and weighted criteria.
Download template →When external support is useful, which tasks can be outsourced and how to maintain quality and commercial control.
Read guide →From feasibility and cost planning through tender evaluation, construction reporting and final account.
Read guide →A structured final review covering documents, quantities, pricing, programme, risks and submission requirements.
Use checklist →01
These resources explain practical considerations but do not replace advice based on the specific drawings, contract, procurement route and project circumstances.